Diviner Begins Scanning
Diviner was commanded to begin its nominal scanning sequence this morning and we have received engineering telemetry that indicates that everything is going well. The chart shows the positions of Diviner’s elevation and azimuth actuators over a 25 minute period that included three blackbody/space calibrations and one solar calibration. Diviner’s first radioimetric data should be available tomorrow morning.
